· 20 Acres Clearing and Grubbing
· 700 LF Reinforced Concrete Pipe
· 7 Catch Basins
· 20,000 SY Lime Stabilized Base
· 375,000 CY of Excavation and Haul off
Copyright © 2018 Shackelford Construction and Hauling - All Rights Reserved.